Baixar Project Schedule - CloudSync 2.0 APK
ID: de.thorstensapps.tt.plugin.simplesync
-
Versão:
2.0
-
Atualização em:
2021-02-01
Version code: 54, Architecture armeabi-v7a, Android 5+
Instalação segura com garantia, sem adição de anúncios ou malware
How to install APK
APKs de outras variantes:
Architecture armeabi-v7a, Android 9+Code 54, .ZIP, 6 MB
Este aplicativo tem acesso a:
-
Accounts:
Find accounts on the device:
• Allows the app to get the list of accounts known by the device. This may include any accounts created by applications you have installed..
Use accounts on the device:
• Allows the app to request authentication tokens..
Read google service configuration:
• Allows this app to read Google service configuration data..
-
Network:
View network connections:
• Allows the app to view information about network connections such as which networks exist and are connected..
Full network access:
• Allows the app to create network sockets and use custom network protocols. The browser and other applications provide means to send data to the internet, so this permission is not required to send data to the internet..
Receive data from internet:
• Allows apps to accept cloud to device messages sent by the app's service. Using this service will incur data usage. Malicious apps could cause excess data usage..
-
App information:
Run at startup:
• Allows the app to have itself started as soon as the system has finished booting. This can make it take longer to start the device and allow the app to slow down the overall device by always running..
-
Effects on battery life:
Prevent device from sleeping:
• Allows the app to prevent the device from going to sleep..
Project Schedule - CloudSync 2.0 APK for Android 4.1+
Versão | 2.0 for Android 4.1+ |
Atualização em | 2021-02-01 |
Tamanho do arquivo | 6.023.967 bytes |
Permissões | ver permissões |
O que há de novo | - Bugs fixed |
Histórico de versões:
- 1. LATEST. Project Schedule - CloudSync Varies with device APK (2021-10-02, 5 MB)
- 2. Project Schedule - CloudSync 2.1 APK (2021-03-10, 6 MB)
- 3. Project Schedule - CloudSync 2.0 APK (2021-02-01, 6 MB)
- 4. Project Schedule - CloudSync 1.4.3 APK (2020-05-06, 5 MB)
- 5. Project Schedule - CloudSync 1.4.2 APK (2020-03-28, 5 MB)
- 6. Project Schedule - CloudSync 1.4.1 APK (2019-11-02, 4 MB)
- 7. Project Schedule - CloudSync 1.4.1 APK (2019-10-29, 4 MB)
- 8. Project Schedule - CloudSync 1.4 APK (2019-04-15, 4 MB)
- 9. Project Schedule - CloudSync 1.3.7 APK (2018-05-29, 3 MB)
- 10. Project Schedule - CloudSync 1.3.4 APK (2016-05-22, 3 MB)
- 11. Project Schedule - CloudSync 1.3.3 APK (2015-09-26, 3 MB)
- 12. Project Schedule - CloudSync 1.3.2 APK (2015-07-21, 3 MB)
- 13. Project Schedule - CloudSync 1.3.2 APK (2015-06-10, 3 MB)
- 14. Project Schedule - CloudSync 1.3.1.3 APK (2015-01-01, 2 MB)
Mostre mais
Igual a "Project Schedule - CloudSync"
Hit APK
Mostre mais