Project Schedule - Office
ID: de.thorstensapps.tt.plugin.mpp
-
版本:
Varies with device
-
更新于:
2022-09-27
立即下载 APK
保修安全安装,无附加广告或恶意软件
的描述 Project Schedule - Office
Plugin for the app Project Schedule
To use this plugin it is necessary that the main app is installed.
Installing this plugin enables importing of MS Project files with the mpp file extension and reading/writing of MS Excel files.
Writing changes back to a mpp file is NOT possible.
Opening complex projects can lead to an out of memory exception. In this case try to save your project as an xml file and import it with "MSPDI-XML-Import".
Uses code from the following open source projects
MPXJ (see http://mpxj.sourceforge.net/ for details)
Apache POI (see http://poi.apache.org/ for details)
To use this plugin it is necessary that the main app is installed.
Installing this plugin enables importing of MS Project files with the mpp file extension and reading/writing of MS Excel files.
Writing changes back to a mpp file is NOT possible.
Opening complex projects can lead to an out of memory exception. In this case try to save your project as an xml file and import it with "MSPDI-XML-Import".
Uses code from the following open source projects
MPXJ (see http://mpxj.sourceforge.net/ for details)
Apache POI (see http://poi.apache.org/ for details)
展示更多
Project Schedule - Office Varies with device APK 为了 Android Varies with device+
版本 | Varies with device 为了 Android Varies with device+ |
更新于 | 2022-09-27 |
安装 | 100.000++ |
文件大小 | 1.197.735 bytes |
权限 | 查看权限 |
什么是新的 | Updated third party library |
版本历史:
- 1. LATEST. Project Schedule - Office Varies with device APK (2022-09-27, 1 MB)
- 2. Project Schedule - Office 1.2.2 APK (2015-06-05, 1 MB)
- 3. Project Schedule - Office 1.2.1.3 APK (2015-01-01, 890 KB)
展示更多
相似 "Project Schedule - Office"
命中 APK
展示更多